Leave a message
Product

SINGLE CORE ELECTRIC CONCENTRIC CABLE

The cables are for service-entrance and other uses.

  • Application The cables are for service-entrance and other uses.
  • Standard  IEC60502 and UL854
  • Construction Cu/Al/Al 8000/CCA Conductor , XLPE Insulation , Concentric Layer , XLPE/PE/PVC Jacket.

Product introduction

Application The cables are for service-entrance and other uses.

Standard  IEC60502 and UL854

Construction Cu/Al/Al 8000/CCA Conductor , XLPE Insulation , Concentric Layer , XLPE/PE/PVC Jacket

Product Data Sheet

Single conductor type concentric cable

Nominal cross-section Strands number of conductor Insulation nominal thickness Concentric conductor Overall jacket nominal thickness Approx. overall dia. Approx. weight. DC resistance at 20℃
Min. single wire dia. Max. wire number
mm2 AWG Nos mm mm Nos mm mm kg/km Ω/KM
2.08 14 7 1.14 0.51 68 1.14 7.80 73 8.78
2.63 13 7 1.14 0.51 68 1.14 8.06 84 6.97
3.31 12 7 1.14 0.51 68 1.14 8.26 98 5.53
4.17 11 7 1.14 0.51 68 1.14 8.54 116 4.39
5.26 10 7 1.14 0.51 68 1.14 8.86 138 3.476
8.37 8 7 1.14 0.51 68 1.14 9.55 197 2.186

Packaging & Delivery

Our cables, wires, conductors are usually packed in wood drum, Iron-wooden drum.  Steel reel will also be used if required by client. For some short length, such as 50m, 150m, 300m, the conductor can also be packed in coil.

FAQ

What information should we provide to get a quotation?

Product standard, Conductor Size, Quantity, Sea port/Airport for delivery, etc.

How long time can we get your quotation?

Usually we will quote to you within 24 hours after get your detailed inquiry information

How can I know have you ever exported to our country/area? Are you familiar with our market?

We have exported to 100+ countries/area. We have rich export experience and will try our best to serve you and meet your needs.  You can contact us for detailed communications.

What trade term you offer?

Normally we offer EXW,FCA,FOB,CNF,CIF according to customer requirements.

What`s your lead time for the order?

According to different order quantity, the lead time is different.  Normally it is 7- 30 days for production. For large quantities, the goods will be shipped in partial times according to schedule.

Leave Message